Party Chief
Job Description:
Geo Ocean 9
Start date: 27th May +/- 2 days
Duration: 4 weeks
Location: United Kingdom (inside 12nm limit)
Project: Transmission Investment Limited – LirIC Interconnector – UXO and geotechnical surveys
Note: UK passport/visa holders preferred but also open to those with ILO 108 ratified Seaman’s Book.
| Start date | Party Chief | Senior Online Surveyor (Qinsy) |
| 27th May +/- 2 days | 1 needed | 1 needed |
Geo Ocean 6
Start date: 27th May +/- 2 days
Duration: 4 weeks
Location: United Kingdom (inside and outside 12nm limit)
Project: National Grid – Western Link 2 – Geotechnical surveys (CPT & vibrocore)
Note: Non-UK/EU options must have an ILO 108 ratified Seaman’s Book.
| Start date | Senior Online Surveyor (Qinsy) |
| 27th May +/- 2 days | 1 needed |
Geo Ocean 8
Start date: 10th June +/- 2 days
Duration: 4 weeks
Location: United Kingdom (outside 12nm limit)
Project: National Grid – Eastern Green Link 3 – UXO and archaeological surveys
Note: Non-UK/EU options must have an ILO 108 ratified Seaman’s Book.
| Start date | Party Chief |
| 10th June +/- 2 days | 1 needed |
Geo Ocean 5
Start date: 10th June +/- 2 days
Duration: 4 weeks
Location: United Kingdon (outside 12nm) / Germany / Denmark (inside and outside 12nm)
Project 1: Scottish Power – East Anglia Hub – ROV inspections
Project 2: 50 Hertz – Ostwind 1 / 2 / 3 / 4 and Bornholm Energy Island – Depth of burial surveys
Notes: Client (50Hertz) requires crew to have the following certs: GWO Sea Survival, Fire Fighting and First Aid. Please consider the Schengen visa requirement where applicable.
| Start date | Senior Online Surveyor (Qinsy) |
| 10th June +/- 2 days | 1 needed |
Geo Ocean 9
Start date: 24th June +/- 2 days
Duration: 4 weeks
Location: United Kingdom (inside 12nm limit)
Project: Transmission Investment Limited – LirIC Interconnector – Geotechnical surveys
Note: UK passport/visa holders preferred but open to those with ILO 108 ratified Seaman’s Book.
| Start date | Party Chief | Senior Online Surveyor (Qinsy) |
| 24th June +/- 2 days | 1 needed | 1 needed |
Geo Ocean 6
Start date: 24th June +/- 2 days
Duration: 4 weeks
Location: United Kingdom (inside and outside 12nm limit)
Project: National Grid – Western Link 2 – Geotechnical surveys (CPT & vibrocore)
Note: Non-UK/EU options must have an ILO 108 ratified Seaman’s Book.
| Start date | Senior Online Surveyor (Qinsy) |
| 24th June +/- 2 days | 1 needed |
Geo Ocean 5
Start date: 8th July +/- 2 days
Duration: 4 weeks
Location: Netherlands / Belgium / United Kingdom (outside 12nm)
Project 1: NKT – Ijmuiden Ver – Cable tracking / depth of burial surveys
Project 2: Elia – Nemo Link / Modular Offshore Grid (MOG) 1 – ROV inspections
Notes: Please consider the Schengen visa requirement where applicable.
| Start date | Party Chief |
| 8th July +/- 2 days | 1 needed |
Geo Ocean 8
Start date: 8th July +/- 2 days
Duration: 4 weeks
Location: United Kingdom (outside 12nm)
Project: National Grid – Eastern Green Link 3 – UXO and archaeological surveys
Notes: Non-UK/EU options must have an ILO 108 ratified Seaman’s Book.
| Start date | Senior Online Surveyor (Qinsy) |
| 8th July +/- 2 days | 1 needed |
Elevate Offshore (Head Office)
- A: 8 EU Tong Sen Street, The Central, #19-84, Singapore, 059818
- E: operations@elevateoffshore.com
- T: +65 6592 3215
Elevate Offshore (UK)
- A: Osprey House, Malpas Road, Truro, Cornwall, TR1 1UT
- E: operations@elevateoffshore.com
- T: +44 (0)7943 770411